Details
Episode 21 - NSW Transformation - S1.E21

Riddled with rats, ants, termites, a possum and asbestos, Michelle and Steve's 1950's weatherboard house is a ticking time bomb. Building supervisor Chester shuts down the hazardous site and teams are evacuated as the asbestos is removed. Taking an entire day out of their schedule for the asbestos removal, the teams are way behind. Finally able to get back on site, contestants are faced with yet another problem: with all the walls stripped bare of the asbestos, the house has massive structural damage. The renovation has never been this challenging or teams this far behind. The teams are in big trouble.

Back to main page

Episode 21 - NSW Transformation - S1.E21

June 18, 2013
0
ratings
0
reviews
0
video reviews
N/A Not available

Cast (0)

No data available

Crew (0)

Directing

No data available

Writing

No data available

Production

No data available

Sound

No data available

Art

No data available

Camera

No data available

Costume & Make-Up

No data available

Crew

No data available

Editing

No data available

Lighting

No data available

Visual Effects

No data available