
Episode 08 - S1.E8
The kitchen floor needs further excavation, work continues on the new staircase, and the conservatory floor base is poured. Tips on fitting a front door lock and a doorbell, removing an old radiator, and gloss painting a door.
Episode 08 - S1.E8
July 5, 2004
0
ratings
0
reviews
0
video reviews