Details
A Pane in the Glass / Sealing the Deal - S2.E3

After fixing their faulty wiring, moods go from bad to worse as the handymen find themselves installing windows and enclosing walls. Tempers flare when the handymen switch nominators and work long into the night applying plywood sheeting to their sheds. The workload and tension only increase as the handymen slap up denim insulation and wrap up their sheds with a vapour barrier. The episode ends when they attempt to build a picnic table from scratch.

Back to main page

A Pane in the Glass / Sealing the Deal - S2.E3

April 30, 2007
0
ratings
0
reviews
0
video reviews
N/A Not available

Cast (0)

No data available

Crew (0)

Directing

No data available

Writing

No data available

Production

No data available

Sound

No data available

Art

No data available

Camera

No data available

Costume & Make-Up

No data available

Crew

No data available

Editing

No data available

Lighting

No data available

Visual Effects

No data available